The Architecture Behind Jesuit’s New Natatorium

-

Set to open in April 2021, the Jesuit Natatorium has been a project in the making since early 2017. I decided to look at the new campus addition from an architectural standpoint. Through Mr. Alex Soich, Jesuit’s Chief Financial Officer, I was able to ask the following questions of Jesuit’s Architecture firm, HKS.

Q: How long did the design process take?

A: “The design process began in earnest in the spring of 2017. Although the majority of design elements were completed prior to breaking ground in July 2019, minor details have continued throughout construction.”

Q: Did Jesuit have any influence on the design? (for example: color scheme, incorporation of school identity)

A: “Specifically regarding the design process, HKS, our architecture firm, worked collaboratively with the school and donors to create a design that seemed intentional with the other buildings on campus. Because of our planned development, PD, with the city of Dallas, we had to locate the natatorium where it was constructed.”

Q: Did the swim coaches have any influence on the design?

A: “Within the school, Coach Moyse was consulted about the design and utility of some of the design aspects.”

Q: How many renditions of the design were there?

A: “While there was only one rendition of the design, it was an evolving design process. Said another way, we did not ask the architect to design 3 different buildings and picked one.”

Q: Did you also do the landscape planning or was a landscape architect hired?

A: “We utilized a sub contractor and landscape consultant for our design and landscaping work, which has not begun on site.”

Q: What are the main materials used to construct the building?

A: “In terms of materials, it’s not entirely accurate to define the main materials used in construction but concrete and steel are signature elements within the design and construction.”

Q: How many gallons of water does it take to fill the pool?

A: “The competition pool holds roughly 381,000 gallons of water. The warm-up pool holds roughly 69,000 gallons of water.”

Q: Did any of your past projects influence the design of this building?

A: “The design was based on the surrounding campus. The curvature of the building is meant to match surrounding buildings on campus and look intentional as if it were constructed with the other buildings as part of one holistic design.”

Q: How did COVID affect progress?

A: “COVID has not greatly impacted the construction of the building.”

Q: With the timeline that was created, did you manage to finish designing before or after the deadline?

A: “Additional facilities such as hand washing stations were added to the job site but ultimately, construction was able to progress and stay on schedule.”

Everyday, as we walk from the Anderson and Senior parking lots to school, we see the construction of the natatorium underway. We can all appreciate what we see on the surface level, but diving deeper into the process behind the construction of the building gives a whole new perspective.

I’d like to give a special thanks to Mr. Alex Soich for facilitating this Q&A with HKS.

Blake Woodard '22, Editor-in-Chief
Blake Woodard '22, Editor-in-Chief
In my free time I like to watch movies and play tennis. I play for Jesuit’s tennis team, and like writing for The Roundup.

3 COMMENTS

The Jesuit Journal

Fall 2025

The Jesuit Journal provides a space for students interested in writing and visual art with a space to showcase their creative talents.

Latest News

Under the Lights and Onto the Course: Cross Country Season Begins

Under the bright lights, the Jesuit runners lined up on the line knowing months of training had prepared them for this race. Jesuit Cross Country recently held their annual "Thursday Night Lights," a two-mile time trial and yearly tradition...

Solidarity and Faith: Jesuit Dallas Students Embark on Quispicanchi Mission Trip

There, on the imposing shelf of an Andean mountain sat in a staggered circle two groups of high-school age, young adults, drastically different in their upbringing yet remarkably unified. Through grins and laughs, simple translations were exchanged from English...

Bold Predictions for Every NFL Team in 2026 (Vol. 2)

Everybody loves a circular ending. And after three years of writing for the Jesuit Roundup (starting from Freshman year), it's about time I revisit (as a Senior) the article that started everything for my sportswriting. The Bold Predictions For...

Jesuit Rangers Fall to Sachse in Friday Night Setback

The Rangers opened their 2026 season on the road on Friday night, falling to Sachse 52-24 at Homer B. Johnson Stadium. The Rangers moved the ball well at times, finishing with 346 yards of total offense and 23 first...